Independent educational resource. Not affiliated with CAST, SonarSource, or any code-analysis vendor. Figures cite CISQ, Stripe, Besker et al. and BLS.

Methodology

How the figures on this site are built.

Every dollar figure here is either a published number, named with its source, or a calculation from those numbers with the formula shown. This page lists both.

The core formula.

Velocity loss, the largest line in any debt cost, is engineers x loaded cost per engineer x share of time lost to debt. The Technical Debt Ratio, used with static-analysis output, is remediation cost / development cost, read against SonarQube's default A to E grid. Both are worked through on the frameworks page and priced on the cost of technical debt page.

Published figures we use.

FigureValueSource
Mean annual wage, US software developers (15-1252)$148,100BLS OEWS, May 2025
Wages as a share of total compensation, management, professional and related jobs, private industry68.5%BLS ECEC, June 2026 (Table 4)
Developer time spent on technical debt33% (13.5 of 41.1 hours a week)Stripe, The Developer Coefficient, September 2018
Developer time spent on all maintenance, including debt42% (17.3 hours a week)Stripe, The Developer Coefficient, September 2018
Developer working time wasted because of technical debt23%Besker, Martini and Bosch, Journal of Systems and Software 156 (2019)
Annual US cost of poor software quality$2.41 trillion, of which about $1.52 trillion accumulated technical debtCISQ, The Cost of Poor Software Quality in the US, 2022

Our calculations and assumptions.

Loaded cost per engineer
BLS mean wage divided by the ECEC wage share: $148,100 / 0.685 = about $216,200. Replace it with your own payroll figure if you have one.
Hourly and daily loaded cost
Loaded cost divided by 2,080 paid hours (about $104 an hour) or 260 working days (about $832 a day).
Codebase-age multiplier
1 + 3.5% per year of age in the Financial Impact calculator. Our modelling assumption, not a published rate.
Growth of untreated debt
15 to 25% a year, 18% midpoint, in the three-year projections. Our planning band, not an audited rate.
Engineer-hours per incident
A placeholder of 24 hours in the calculator. No study publishes a cost per incident; use your own incident log.
Industry debt-time table on /cost
Illustrative. No public survey reports debt time by sector.

Published by Digital Signet Limited. See about this site.